National standard spot 3PE spiral steel pipe

Views : 1329
Update time : 2023-03-01 09:35:20

  3PE spiral steel pipe processed by 3PE spiral steel pipe factory has greater flexibility in the size and specification range of diameter and wall thickness, especially in the production of high steel grade thick wall pipe, especially small and medium-sized diameter thick wall pipe, which has incomparable advantages in other processes, and can meet more requirements of users in the specification of spiral steel pipe.

  Using the advanced double-sided submerged arc welding process, welding can be realized at the best position. It is not easy to have defects such as misalignment, welding deviation and incomplete penetration, and it is easy to control the welding quality.

  3PE spiral steel pipe factory carries out 100% quality inspection on steel pipes, so that the whole process of steel pipe production is under effective detection and monitoring, effectively ensuring the product quality.

  All the equipment of the whole production line has the function of networking with the computer data acquisition system to realize real-time data transmission. The central control room will monitor the technical parameters in the production process.

  The production control of 3PE spiral steel pipe plant is mainly to improve the plasticity of steel pipes, improve the cleanliness of molten steel, reduce harmful impurities, and improve the overall quality of steel pipes. In the production process, select reasonable cooling criteria to prevent internal cracks and improve the quality of steel pipes from various aspects. The heating temperature of spiral steel pipe shall be controlled reasonably in the production process, and the best heating temperature shall be selected by measuring the thermoplastic curve.

  Pay attention to the satisfied heat preservation time when heating the tube blank to reduce the deformation resistance and improve the plastic resistance of the 45 # thick wall spiral tube.

  The production process of 3PE spiral steel pipe plant requires many procedures. The final step is to reduce the roll speed, which is the key parameter of the piercing process. In the process of changing the roll speed from low to high, there is a critical roll speed that begins to show delamination.

  When the roller speed is low, the tube blank simply forms a cavity; When the roller speed is high, the tube blank and 45 # spiral steel pipe simply form the defect of layering.

  In order to eliminate the layering defect of pipe blank and 45 # structure spiral steel pipe, the construction condition of the inner anti-corrosion layer of 3PE spiral steel pipe unit should be to reduce the roller speed below the critical roller speed at the beginning of layering. Generally, the construction of cement mortar fabric should be carried out after the spiral pipe is laid, the pressure test is qualified, and the soil is compacted according to the plan. During fabric construction, it is necessary to keep the pipeline in a stable condition.

  If the fabric anti-corrosive coating is made first and then the pipe is laid down, the anti-corrosive coating will be damaged due to the thin wall and small rigidity of the steel pipe and large deformation during lifting, transportation and soil return during construction.

Related News
Read More >>
Working Pressure of Seamless Steel Pipe Working Pressure of Seamless Steel Pipe
Sep .17.2026
  Seamless steel pipe actual bearing pressure may be affected by many factors such as the quality of the pipe, processing technology, and use environment Please feel free to contact us if you have any questions Email : pipe@stpipefitting.cn
(SMLS pipe) is a type of pipe produced without welds by deforming the metal as a whole using piercing and rolling techniques. Compared to welded steel pipe, its core advantage stems from the continuity of the material and the uniformity of its structure, providing superior reliability and safety under high pressure, high temperature, and complex stress environments. This makes seamless steel pipe a fundamental and reliable material in the petroleum, chemical, natural gas, and power industries for critical processes and the transportation of hazardous media.
Seamless carbon steel pipe Sch 40 Seamless carbon steel pipe Sch 40
Sep .15.2026
Seamless Carbon Steel Pipe Sch 40 (Schedule 40) is a seamless steel pipe specification that meets the American standard. Its pipe wall thickness is Sch40 (corresponding to the standard wall thickness series), which represents the standard wall thickness under a specific pressure level and is often used in occasions with higher pressure and temperature.
Schedule 80 Carbon Steel Pipe: Thickness, Dimensions & Weight in mm Schedule 80 Carbon Steel Pipe: Thickness, Dimensions & Weight in mm
Sep .10.2026
Schedule 80 Carbon Steel Pipe is made up of carbon steel materials. The carbon steels can vary in composition based on the grades. The strengths and the toughness vary. To have an international and equal identification of the pressure capacities of the pipes, the schedule scale is used. The wall thickness grades of the steel pipe range from Schedule (SCH) 5 to Schedule (SCH) 160. SCH 5 has the lowest pressure resistance, while SCH 160 has the highest.
Steel Pipe Sizes Explained: NPS, OD and Wall Thickness Steel Pipe Sizes Explained: NPS, OD and Wall Thickness
Sep .08.2026
Steel pipe sizing can be confusing, especially for buyers who are new to piping specifications. A pipe's designated size often differs from its actual dimensions, which can lead to mistakes during purchasing or design.