Anti-corrosion spiral steel pipe will produce slag inclusions during the production process what is the reason?

Views : 990
Update time : 2023-10-08 14:33:44

  Reasons for slag inclusion during the production of anti-corrosion spiral steel pipes.

  The first thing to consider is whether it is caused by a large amount of debris contained in the raw materials.

  The raw materials include base metal, welding wire, flux, etc., which are all possible causes of slag inclusion; and then the selected welding process parameters are inappropriate, which is not conducive to the formation of slag.

  Resulting in the occurrence of slag inclusions; incomplete cleaning between layers during multi-layer welding is also the cause of slag inclusions in the production of anti-corrosion spiral steel pipes.

Related News
Read More >>
What are the sizes and weights of A106 seamless steel pipes? What are the sizes and weights of A106 seamless steel pipes?
Feb .11.2025
Shengtian Group offers standard size ASTM A106 seamless steel pipes primarily used in the oil and gas industry, automotive and engineering industries. This is the most common and widely used product and comes in different sizes and thicknesses.
What is difference between sch 40 and sch 40s SMLS pipe? What is difference between sch 40 and sch 40s SMLS pipe?
Feb .06.2025
Sch 40 SMLS pipe or schedule 40 is a standard of the wall thickness of steel pipes in accordance with ANSI. sch40s stands for strong, so pipes with a larger thickness.
How to cool A53 large diameter steel pipe after quenching? How to cool A53 large diameter steel pipe after quenching?
Jan .23.2025
ASTM A53 large-diameter thick-walled steel pipe production process of generally includes hot rolling, hot coiling, casting and other production methods. Large-diameter thick-walled steel pipes are mostly produced in double-sided submerged arc welding (SSAW pipe). After bending, jointing, internal welding, external welding, straightening, and flattening, the products meet the standards of the American Petroleum Institute.
Nepalese Client Orders Large Customized Pipe Fittings and Steel Pipe for Dam Hydropower Project‌ Nepalese Client Orders Large Customized Pipe Fittings and Steel Pipe for Dam Hydropower Project‌
Jan .21.2025
A reputable client from Nepal has recently placed a significant order for Large customized pipe fittings and steel pipe to be utilized in a dam hydropower project within the country. The decision to procure these Customized pipe fittings and steel pipe underscores the client's commitment to ensuring the project's success and efficiency.